SERVICE · BACKUP POWER

EMERGENCY GENERATORS & UPS SYSTEMS

GENERATOR INSTALLATION · UPS SYSTEMS · ATS · BATTERY BACKUP · DESIGNED FOR ZERO DOWNTIME

STATUS: ONLINE · DISPATCH READY
38
YEARS IN BUSINESS
4
BRANCH LICENSES
$200M+
PROJECTS COMPLETED
10M+
FIXTURES MANAGED
24/7
EMERGENCY RESPONSE
12
STATES SERVED

OVERVIEW

WHAT WE DO

Backup power infrastructure exists for one reason: to keep critical operations running when the utility fails. Lightning Mobile Electric designs and installs emergency generators, UPS systems, and automatic transfer switches for healthcare facilities, data centers, manufacturing plants, retail operations, and commercial buildings. We size systems to the actual critical load, not to round numbers. We test systems under real load conditions. And we maintain them on the schedules that keep them ready when they are needed.

CAPABILITIES

SCOPE OF SERVICE

GENERATOR INSTALLATION

New generator installation, existing unit replacement, and capacity upgrades for commercial and industrial facilities. Fuel source selection — natural gas, propane, or diesel — is driven by availability, runtime requirements, and local code. We manage the full scope: equipment procurement, concrete pad and structural work, fuel system installation, automatic transfer switch coordination, utility notification, and commissioning.

  • • Natural gas, propane, and diesel generator installation
  • • Standby and prime power configurations
  • • Concrete pad and structural support installation
  • • Fuel system installation and fuel management setup
  • • Automatic transfer switch (ATS) integration
  • • Utility notification and permit coordination

UPS SYSTEMS

Uninterruptible power supply installation for IT infrastructure, data centers, healthcare equipment, and process-critical systems. We work with modular and monolithic UPS topologies across all major manufacturers. UPS installations are executed under the facility's change management process, with the system installed and tested on bypass before the load is transferred. Static transfer switch testing is performed as part of commissioning.

  • • Modular scalable UPS installation (Vertiv, Eaton, Schneider)
  • • Monolithic double-conversion UPS installation
  • • Battery monitoring system and remote alerting setup
  • • Static transfer switch (STS) testing and documentation
  • • Runtime capacity calculation and verification
  • • Bypass and maintenance bypass configuration

BATTERY SYSTEMS

Battery string installation, replacement, and maintenance across VRLA, AGM, and lithium-ion chemistries. Battery replacements are executed with the UPS on bypass — no load interruption to the protected equipment. We perform string equalization, capacity testing, and thermal monitoring setup. For facilities converting from VRLA to lithium-ion, we manage the full battery room modification scope.

  • • VRLA and AGM battery string replacement
  • • Lithium-ion battery system installation
  • • Battery string equalization and capacity testing
  • • Thermal monitoring installation and configuration
  • • Battery room ventilation verification
  • • Battery disposal and recycling coordination

PREVENTIVE MAINTENANCE

Backup power systems fail at the worst possible time when they are not maintained. Our preventive maintenance programs include monthly transfer testing, annual load bank testing, battery capacity verification, fuel sampling, and generator service. We maintain maintenance logs that satisfy the requirements of The Joint Commission, NFPA 110, and data center SLA documentation.

  • • Monthly automated transfer switch exercise and logging
  • • Annual generator load bank testing to full rated capacity
  • • Battery capacity and impedance testing
  • • ATS contact inspection and lubrication
  • • Fuel quality testing and tank inspection
  • • NFPA 110 compliant maintenance documentation

TRUSTED BY FORTUNE 500 AND NATIONAL ACCOUNTS

Walmart
Boeing
Matbro
Caterpillar
United Industries
Key Energy
MSI
Pollard Banknote
BOK
Walmart
Boeing
Matbro
Caterpillar
United Industries
Key Energy
MSI
Pollard Banknote
BOK

THE 3P METHOD

HOW WE DELIVER

01

ASSESS

Critical load analysis to identify what must remain powered, for how long, and at what voltage. Fuel source evaluation, utility coordination requirements, and site layout assessment.

02

DESIGN

Generator and UPS sizing, ATS type and rating selection, battery runtime calculation, one-line diagram development, and permit package preparation.

03

INSTALL

Equipment delivery, pad and structural work, fuel system installation, ATS wiring, circuit termination, and battery or fuel commissioning — all coordinated to minimize exposure.

04

TEST & COMMISSION

Full load transfer testing, battery capacity verification, generator load bank test, and documentation package delivery — including the transfer sequence and emergency operating procedures.

COMMON QUESTIONS

FREQUENTLY ASKED

24/7 EMERGENCY