SERVICE · POWER DISTRIBUTION

COMMERCIAL PANEL & SWITCHGEAR UPGRADES

200A SUB-PANELS TO 4000A MAIN SWITCHGEAR · UTILITY COORDINATION · SCHEDULED CUT-OVERS

STATUS: ONLINE · DISPATCH READY
38
YEARS IN BUSINESS
4
BRANCH LICENSES
$200M+
PROJECTS COMPLETED
10M+
FIXTURES MANAGED
24/7
EMERGENCY RESPONSE
12
STATES SERVED

OVERVIEW

WHAT WE DO

Aging and undersized electrical panels are both a safety liability and an operational bottleneck. Lightning Mobile Electric manages commercial panel and switchgear upgrades from 200A sub-panels to 4000A main distribution — including utility coordination, engineering, equipment procurement, scheduled shutdown execution, and commissioning. We serve facilities that cannot afford unplanned downtime. Every upgrade is staged around your operating schedule, managed under a signed Method of Procedure, and closed with full as-built documentation.

CAPABILITIES

SCOPE OF SERVICE

PANEL & SWITCHGEAR REPLACEMENT

Replace aging, obsolete, or undersized panelboards and switchgear with modern, code-compliant equipment sized to current and future facility loads. We perform pre-upgrade load studies to right-size equipment and prevent over-sizing waste. Replacement equipment is sourced from major manufacturers — Square D, Eaton, Siemens, ABB — with proper short-circuit current ratings for the installation.

  • • Main distribution panel (MDP) replacement
  • • Sub-panel installation and upgrade
  • • Automatic transfer switch (ATS) replacement
  • • Bus duct and busway systems
  • • Meter center and CT cabinet upgrades
  • • Short-circuit current rating (SCCR) verification

UTILITY COORDINATION

Panel upgrades often require utility interaction — service size increases, transformer capacity upgrades, new meter sockets, and temporary power during cut-over. We manage the full utility process: load letters, service applications, transformer sizing requests, and coordination of utility field crews. Facilities with active national account utility relationships benefit from our established contacts at Xcel Energy and Rocky Mountain Power.

  • • Utility service application and load letter submission
  • • Transformer capacity upgrade coordination
  • • Meter socket and CT cabinet upgrade
  • • Temporary power during scheduled cut-over
  • • Utility field crew coordination and inspection scheduling
  • • Service restoration coordination and re-energization

LOAD STUDIES & ENGINEERING

Pre-upgrade load analysis is not optional — it is the foundation of a properly engineered upgrade. We perform demand data logging, calculate connected load vs. demand load, and right-size equipment. For larger facilities, we provide stamped electrical drawings and coordinate arc-flash hazard analysis updates to reflect the new equipment ratings. Short-circuit studies are completed where fault current values require verification.

  • • Revenue-grade demand data logging
  • • Calculated vs. measured load comparison
  • • Service entrance and feeder sizing calculations
  • • Arc-flash hazard analysis update (NFPA 70E)
  • • Short-circuit fault current study
  • • Stamped electrical drawings for permit submission

SCHEDULED SHUTDOWNS & CUT-OVERS

Most panel upgrades require a planned shutdown. We work around your operating calendar — nights, weekends, and holidays are standard. For facilities that cannot tolerate any downtime, we engineer temporary generator back-feed solutions that keep critical loads powered through the transition. Every cut-over is executed under a signed Method of Procedure with a staged restoration sequence.

  • • After-hours and weekend shutdown coordination
  • • Temporary generator back-feed for critical loads
  • • Phased migration to limit exposure windows
  • • Method of Procedure development and execution
  • • Load testing and commissioning after energization
  • • Arc-flash label updates and panel schedule revision

TRUSTED BY FORTUNE 500 AND NATIONAL ACCOUNTS

Walmart
Boeing
Matbro
Caterpillar
United Industries
Key Energy
MSI
Pollard Banknote
BOK
Lululemon
Hobby Lobby
Home Depot
Target
Ulta Beauty
Sephora
Chase Bank
Wells Fargo
Best Buy
Amazon
Walmart
Boeing
Matbro
Caterpillar
United Industries
Key Energy
MSI
Pollard Banknote
BOK
Lululemon
Hobby Lobby
Home Depot
Target
Ulta Beauty
Sephora
Chase Bank
Wells Fargo
Best Buy
Amazon

THE 3P METHOD

HOW WE DELIVER

01

ASSESS

Existing system evaluation, demand data logging, load study, equipment specification, and utility capacity verification.

02

ENGINEER

Stamped electrical drawings, arc-flash study update, utility application, and permit package submission to the AHJ.

03

INSTALL

Equipment setting, conductor termination, utility coordination, and temporary power management — executed per the approved Method of Procedure.

04

ENERGIZE

Commissioning, load testing, breaker labeling, arc-flash label installation, as-built panel schedule delivery, and utility inspection coordination.

COMMON QUESTIONS

FREQUENTLY ASKED

24/7 EMERGENCY